Control and supervision of the Douala – Bafoussam road rehabilitation works in three lots; Lot 1: Bekoko - Penja (70 km); Lot 2: Penja – Nkam Bridge (77.7 km) and lot 3: Nkam Bridge – Bandjoun (71.2 km)