Package No. 3 "Construction Work" Under The Project "Maintenance And Repair Of Runways On Both Sides Of The Runway Centerline With A Width Of 7.5M On Each Side (From H8+70 To H9+50; H10+50 To H11+50; H17+72 To H20+60) - Can Tho International Airport"