25 Kv Electrification Work In Connection With Varanasi City Phase -Iii (A. Provision Of 1 Running Line Csl 750 M. E. Provision Of 2 Stabling Line Csl 700 M On South Side Of Line No. 10, F. Conversion Of Line No.17 As Dock Running Line With Csl 400 M With An Engine Escape Line, H. One Party/Saloon Siding 150M) In Bsb Division Of N. E. Railway.