Bndr/Otm/W-08/2025-2026 Dyke Resectioning Work, Height Increasing Work Of The Dyke, Brick Work Along The Toe Of Dyke And Hbb Work Of Top Surface Of The Dyke Of I-3 S-1 T-1 Irrigation Canal From Km. 0.690 To Km. 1.580 = 890.00M In Connection Wi...