Bndr/Otm/W-12/2025-26 Silt Removing Works Of Bera Pumping Station Intake Channel From Km. 0.200 To Km. 0.250 = 50.00 M Including Ndr Budget Under Bera Wd Division, Bwdb, Bera, Pabna During The Fy: 2025-2026.