Removing Of Kerb 04 Nos From Stacking As Perspecification , Arranging Of Kerb 04 Nos On Ground As Perspecification , Removing Of Old Loose Paint By Scratching Asper Specification , Applying Paint 02 Coat Of Og Paint And 01Coat Of Red Oxide As Per Specification , Re Stacking Of Kerb04 Nos As Per Directed By Offg Bso Oblice Ge Ep Jodhpur Quantity: 5