Redevelopment Of Carrer Bogatell Between Carrer Andreu Soler And Plaça De La Vila The Scope Of The Project Includes Around 1,790 M2 Corresponding To The Section Of Carrer Bogatell And Its Intersections With Carrer Andreu Soler And Avinguda Catalunya. The New Section Is Developed On A Single Platform Giving Priority To Pedestrians. This Is Divided In The First Place Into Two Areas Paved With Joints: One With An Open Joint And Permeable To Water For Flower Beds And Trees, And The Other With A Closed Joint For Road Traffic. Between The Two Spaces We Find The Gutter With Culverts That Collect The Cross-Flow Runoff From The Road. Secondly, On The Sides In Contact With The Facade We Find Two Sidewalks (One 2.50M And The Other 3.20M) Paved With A Continuous Joint For The Exclusive Passage Of Pedestrians. The Street Will Be Paved With A 20X20Cm Piece Differentiating 3 Types Of Joint According To Its Use: The Sides In Contact With Facades The Joint Will Be Thin And Continue To Form A Grid, And Will Be Placed On A Concrete Base. In The Central Section, On The Other Hand, The Joint Will Be At The Joint, In The Case Of The Open And Planted Permeable Pavement, And In The Case Of The Paved Road Cushioned. Material Changes In Which The Base And Sub-Base Change, A Galvanized Steel Metal Profile Will Be Used To Ensure A Clean Transition And Good Confinement Of The Pavements. The Project Also Contemplates An Improvement Of Existing Services With The Undergrounding Of Overhead Lines And The Replacement Of Sections Of Collector And Potable Water In Poor Condition. The New Sanitation Will Be Connected To The Existing One On Carrer Mossèn Cinto Verdaguer, So A Section Of Sewer Will Have To Be Built Outside The Scope Of The Work.