Package 02: Construction Items: Repairing Substation Branch No. 2, 3, 4, 5 Hung Linh, Main Shaft From Column 22 To Column 55 And Pump Branch No. 10 Line 377E15.1 Managed By Hung Nguyen Construction Management Team; Repair Of Substations No. 1 Tan Nhuong, No. 1 Hung Khanh, No. 1 Hung Linh, No. 1, 2 Nam Cat Managed By Hung Nguyen Management Team; Repairing 0.4Kv Transmission Line Behind Substations No. 1 Hung Khanh, No. 1, 2, 3 Hung Phuc Managed By Hung Nguyen Electricity Management Team; Repair Of 0.4Kv Transmission Line Behind Hung Loc 1, Ha Huy Tap 7, Nghi Phu 7, Nghi Phu 1, Hung Manh Tien 2, Hoa Tien 2, Nghi Phu 7, Hung Dong Cooperative, Hung Hoa 7 And Phong Khanh Substations Managed By Vinh Electricity Management Team; Repairing The 0.4Kv Transmission Line Behind The Substations Unit 654, Nghi An 3, 6, 6A, 14, 9, 4A, 2, 2A, 16, 5 Managed By The Vinh Power Station Management Team; Repairing 0.4Kv Transmission Lines Behind Hai Giang 3 Substations; Nghi Khanh 1,2,3,6,7,8,10,11 Are Managed By Cua Lo Management Team; Repairing 0.4Kv Transmission Lines Behind Nghi Thai 6 Substations; 12; Nghi Thach 1,4,5,7 Are Managed By Cua Lo Management Team; Repair Of Main Shaft Of Line 471+473E15.8, Thang Long Nr, Transmission, Hon Ngu Sent By Qldlkv Team