Erection, Testing, Commissioning Works Includes Shifting, Unloading, Storing (At Switchyard Area Of Power House-1), Upkeeping,Shifting To & Fro From Store To Work Location/Any Location Within Site Boundary, Receipt & Verification Of Material, Material Reconciliation, Verification, Record Keeping, Material Relocating As Per Site/Storage Requirements, Safe Keeping, Pre-Erection Assembly, Erection/ Installation Of The Material/ Equipment As Per Drawings/Instruction Of Site Incharge, Complete Testing & Commissioning, Reconciliation After Completion Of Etc And Handing Over Surplus Material & Spares To Bhel/Customer At 220Kv Switchyard Of Power House-I, 3X33Mw Shapurkandi Hep-I, Punjab State Power Corporation Limited (Pspcl), Pathankot, Punjab