Construction Of Four Cogeneration Sources In The Form Of Gas Engines With An Installed Capacity Of 2X3.1-3.3 Mwe And 2X4.3-4.5 Mwe, Powered By Type E Natural Gas, And Adaptation Of The Electrical Switchboard In The Ostrowski Zakład Ciepłowniczy Together With The Construction Of An Electricity Connection.