(A) Feasibility Study And Detailed Project Report For Elimination Of Level Crossing With Road Over Bridge At Railway Crossing Of Katihar Division.(38 L-Xing). (B) Feasibility Study And Detailed Project Report For Elimination Of Level Crossing With Road Over Bridge At Railway Crossing Of Katihar Division.(55 L-Xing).