Ktps-V Stage -Bm-Removal Of Accumulated Ash And Debris In Pent House, Drum Deck Area, Dog House, S-Panel Houses Of Gooseneck Area, Ceiling Girder Beams Area On Top Of The Boiler And Buck Stay Beam From 9Th Floor To 1St Floor Of The Boiler In Unit-X During Overhaul Period Of 2026-27-Reg.