Announcement From The Government Delegation In Madrid, Calling For The Preparation Of Minutes Prior To Occupation And, If Appropriate, Formalization Of The Occupation Minutes In The Forced Expropriation Procedure For The Execution Of The Project "Obenque Solar Photovoltaic Installation, With 55.36 Mw Of Installed Power And Its Evacuation Infrastructure", In The Municipal Areas Of Santorcaz And Anchuelo (Madrid).