The Object Of The Contract Corresponds To The Preparation Works Of The Premises Intended For The Installation Of The Carbon Dioxide System And The Extension Of Services; The Construction Of The Carbon Dioxide Storage And Dosing Facility At The Etap, Including The Ancillary Electrical, Signal And Water Services, Leaving The Entire System In Operation.