Removal Of Grass, Weeds, Vegetation (Vines), Plants, Ghabajaria Etc Observed In Canal Water In Floating/Stagnant Condition Including Removal Of Silt Deposited On Slope In Running Water Condition And Disposal Of Waste Recovered To Out Side The Canal Up To 2.00 Km Lead And All Lift Using Long Boom Excavator Having 17.00 M Super Long Boom, 10.00 M Super Long Arm With Suitable Bucket Having Horizontal Land Reach Of 27.00 M And Vertical Digging Reach Of 22.30 M Between Nmc Ch.282.120 To 289.620 Km On Both Sr & Ip Side