1.Salem Division - Nilgiri Mountain Railway - Tsr(P) -13.535 Tkm With Psc 52 Kg Metre Gauge Sleepers 2. Salem Division - Nilgiri Mountain Railway - Trr(S) With 52 Kg Rails - 21.9 Tkm 3. Through Sleeper Renewal (Primary) Psc Meter Gauge Between Qlr-Ady Km 9/850-12/200 (2.350 Km) In Rack Section In Sse/Pway/Onr Section 4. Through Sleeper Renewal (Primary) Psc Meter Gauge Between Qlr-Ady Km 7/500-9/850 (2.350 Km) In Rack Section In Sse/Pway/Onr Section 5. Nm Railway: Ttr (P&C) -1 In 8.5 -11 Sets In The Sse/Pw/Onr Section. 6. Nilgiri Mountain Railway - Renewal Of Through Rack Bar - 4.800 Tkm (Between Km.7/400 To 12/200)