Carry Out The Complete Demolition, By Mechanical And Manual Means, Of The Current Municipal Building Of The Garzón Mayor'S Office, Located On Carrera 8 No. 7-74 Corner, Including Structural And Non-Structural Elements, Removal Of Existing Networks, Disconnection And Removal Of Elevator; As Well As The Disassembly Of Equipment And Any Other Element Present In The Building, It Includes Removal, Loading, Transportation And Final Disposal Of Construction And Demolition Waste (Rcd).