Necessary Field Works And Calculations, Structural Evaluation Of Pavement By Cutting Pit With Photograph, Drone Shoot Videography Throughout The Road, Conducting Traffic Census For A Continuous Period Of 7 Days, Axle Load Survey For 3 Days And Submission Of Dpr (6 Copies) In Connection With Indas-Saspur-Akui (Mdr) Road From 0.00 Kmp To 14.00 Kmp, Strengthening Work Under Bishnupur Division, P.W.Dte In The District Of Bankura