Supply And Commissioning Of Following Set Of Items : I) Copper Pipe 1/2 Inch Along With 2.5 Sqmm 4 Core Wire And Sleeve - 12 Meter Ii) Copper Pipe 1/4 Inch Along With 2.5 Sqmm 4 Core Wire And Sleeve - 12 Meter Iii) 4 Core 1.5 Sq.Mm Cable - 30 Meter. Iv) 4 Core 10 S Q.Mm Cable - 20 Meter. V) R32 Gas - 4.5 Kg Vi) Imr, A7 - 02 Nos Vii) Suction Pipeline For Wra- 03 Nos. Viii) Polyamide Conduit Pipe 25Mm - 2 0 Meter Ix) (A) Wiring Works Of Split Ac Units - Replacement/Provision Of Power Cables(Outdoor To Indoor Unit) Of 3 Nos. Of Split Ac Units At 3 L Ocations(Hall=Supervisor Room + Staff), (B) Refrigeration Works - 3 Split Ac Units Replacement/Provision Of Copper Tubes Of Suction And Disch Arge Line Between Indoor And Outdoor Units; Gas Leakage ; Gas Charging, Ac Split Ac Units Working Testing. (C)Wiring Works Of 02 Nos. Of Wra - Replacement /Provision Of Wra Wiring From Wra In Underframe To Roof Junction Box In Generator Room. (D) Replacement/Provision Of Underf Rame Cable From Dg Set To Gpr System From Roof Junction Box To Gpr System In Underframe And Erection, Installation And Commissioning Of All Above Items. [ Warranty Period: 30 Months After The Date Of Delivery ] ]