Development Of A Conceptual Design For The Development Of The Area - Part Of The Plot No. 202/4, Taking Into Account The Location Of The Educational Shelter And The Connection Of Water, Sewage And Electrical Installations To It, Along With Obtaining A Position From The Architectural And Construction Administration Authority, Enabling The Commencement Of Construction Works Consisting In The Construction Of The Shelter, As Part Of The Task: "Dopiewiec - External Classroom At The School (Dbo)". - 1310940