Carry Out The Evacuation Job Of The Fallen Silo Material In Bags Manually And Transported To Actual Unloading Area Through Tractor For Further Processing By Dedicated Equipments At Uct-1b Area, Contractor Has To Supply Required Manpower Detailed , Tools (EXPIRED)