(1)Re-arrangement and renovation work of different floors Of the administrative building located on the east campus of BUP (2)Fencing work of BUP's residential establishment-1 (3)Renovation work of BUP's library and plaster and painting work on the Fair Face Concrete on the interior walls of the academic building. (4)Supply and installation of Ac for BUP's administrative building adjoining the auditorium Controller of Exam, Addl Controller, Addl Controller-2, Addi Reg (Academic), Conference Room, Inspector of College 47 Addl Inspector of College room (5)Purchase and installation of water filter for Academic cum Administrative Building (FBS Tower) under construction on the south side of BUP's east campus (6) Supply and installation of cable trays in BUP's administrative and academic buildings. (EXPIRED)