The Actions Focus On The Supply And Installation Of Luminaires To Replace The Interior Lighting Of The Building By Replacing Luminaires And Wall Lights With New Warm Or Cold Led Types Depending On The Characteristics Of The Rooms, In The Supply And Installation Of Prefabricated Module For The Installation Of The Boiler Room And Chip Silo, With Doors Opening To The Outside, Silo With Two Loading Openings From The Outside, Separation Between Silo And Boiler With Ei120 Fire Resistance, Including Civil Works For The Implementation Of The Module, And The Supply And Installation Of A 300 Kw Wood Chip Biomass Boiler For The Production Of Hot Water For The Heating Circuit And Domestic Hot Water.