Provision of Weeding operation with tractors on the Kalabiya Canal 68,500 from Km 22,500 to Km and the Luxor Canal from the mouth to Km 9,600 and the Ma’alla Canal from the mouth to Km 9,200 and the main Habeel Canal from the mouth to Km 3,600 No. (4) in the Luxor Irrigation Engineering Department