Redevelopment Of The Cr142 Over A Length Of 650 Meters With Development Of Sidewalks. Installation Of Wastewater, Mixed And Rainwater Collectors, Installation Of The Drinking Water Network And Installation Of Dry Networks On The Same Section. Installation Of The Mixed Water Collector In Reinforced Concrete Ø400 Over A Length Of 535 Meters And In Cast Iron Over A Length Of 38 Meters And The Rainwater Collector In Reinforced Concrete Ø300 Over A Length Of 230 Meters.