Development work on the SOKAM Marigot over a 34 km stretch divided into three separate lots. The completion of the reclamation, recalibration, and raising of the banks of the Sokam Marigot over a 12 km stretch; The completion 12 km; of the reclamation, recalibration, and raising of the banks of the Sokam Marigot. c. The demolition of the Sokam Lemradine sluice gate. The completion of the reclamation, recalibration, and raising of the banks of the Sokam Marigot over a 10 km stretch; g. The construction of a crossing structure at PK 29.