Object: According To The Project Of Work Definitively Approved By The Local Government Board Of Callús, On March 19, 2025, The Object Of The Contract Is The Following: A Contract Of Work To Increase The Pressure In The Water Network In The Eastern Sector Of Callús. Specifically, The Contract Provides For The Following Actions: Increase The Pressure Of The Distribution Pipe With The Installation Of Pumping Equipment That Guarantees Sufficient Water Pressure In The Network Of The Whole East Sector Of The Municipality. Installation Of Two Pressure Regulatory Valves In The Crossing Sections With The West Sector To Prevent Overpressure In This Area Of ​​The Network. The Projected Actions Are Mainly Focused On The Following Units Of Construction: - Implementation Of A New Prefabricated House Within The Plot Of The Tank, By The Location Of A Pumping Equipment In The Existing Distribution Pipe. - Update Of The Automation And Telecontrol System Of The Deposit, Including The Integration Of The New Pumping Signals On The Existing Scada Platform For Real-Time Viewing Of The Control Variables. - Implementation Of A Newly Run With Concrete Blocks On Josep Mª Folch I Torres Street In The Road For The Location Of Pressure Regulatory Valves. - Implementation Of A Newly Run -Up With Concrete Blocks On The Anselm Clavé Promenade In Sidewalk By The Location Of Pressure Regulatory Valves