Parties A - Statics: Construction Of A School Building In Wood Construction (Building E) The Building Is To Be Designed In Skeletal Construction. Kind Data: 107 M³ Of Bars And Supports Made Of Board Perrwood 259 M³ Of Wooden Ceilings Made Of Board Wood 1,050 M² Ceilings In The Form Of Hollow Box Elements Construction Of A Technology Floor (Building B) The Technical Floor Is To Be Built On A Reinforced Concrete Structure. Parties B- Technology: Delivery And Laying Of +/- 345 M Ict Tube Delivery And Laying Of +/- 60 M Hdpe Tube With Insulation Game C- Architecture: Roughly 1500 M² Flat Roof Sealing Work With Epdm Foils Approx. 1400 M² Roof Greening Approx. 235 M Rope Protection System Approx. 1,200 M² Rear-Ventilated Facade With Blow-In Insulation And Wooden Slats Approx. 260 M² Wooden Facade (Not Insulated) On Technology Boxes Approx. 60 M² Wood Covering On Loggia And Balcony Approx. 20 M Glass Railing On Loggia And Balcony Approx. 70 M² Etics On Ceiling Surfaces Approx. 70 M² Outdoor Plaster 2-3 Mm Approx. 22 Pieces Post-Bar Elements Wood-Aluminum With Approx. 3-11 Pieces Of Parietal Window And Fixed Glazing Approx. 5 Pieces Of Post-Bar Elements Wood-Aluminum With Fixed Glazing 26 Pieces Of Offshore Systems For Window Elements Approx. 3 Pieces Of Post-Bar Elements Wood-Aluminum Input Situation With Outer Door Elements Approx. Holz-Alu Approx. 8 Pieces Of Facade Ventilation Grille Alu Begin / Duration Of Work: March 2026/145 Working Days