Provision of REHABILITATION OF WIRKOY SHALLOW WELL INCLUDING DEPTH RECOVERY, DESILTING, REPLACEMENT OF DAMAGED CONCRETE RINGS, RAISING AND PROTECTION OF WELL APRON,INSTALLATION OF SOLAR WATER PUMPING SYSTEM WITH SUBMERSIBLE PUMP, CONSTRUCTION OF 20M3 ELEVATED CONCRETE WATER TANK, 1000M EXTENSION PIPE TO TANK AND WATER KIOSK, CONSTRUCTION OF OPEN WATER KIOSKS WITH 6 FAUCETS, FENCING OF THE PERIMETER WALL 20MX20M. - Alight