Extension work at the Ouagadougou bacteriology laboratory, renovations to the Fada laboratory, expansion and rehabilitation at the DRF, construction of latrines at the Tenkodogo SST, a hangar at the DRB cash register, and construction of 22 workbenches with storage spaces for the OST.