Work On The Preparation Of The Individual Thermal Heat Point Within The Preparation For The Heating Season 2025/2026 Of The Heat Consumption System Of The Building Of The Kiev Municipal Academic Puppet Theater On The Level Birch Dnipra On The Street. Metropolitan Andrey Sheptytsky 1-B In Kyiv