The Object Of The Contract Is The Supply And Installation Of A Centrifugal Decanter At The Wastewater Treatment Plant (Wwtp) Of La Selva Del Camp (Baix Camp). The Nature And Extension Of The Needs That Are Intended To Be Covered With The Contract Are Determined In The Technical Specifications.