The Present Study Concerns The Supply And Placement Of Synthetic Lawn, Geosynthetic Drainage System, Led Lighting, Cooling System And Other Equipment, On The Existing Football Stadium That Has A Total Racing Surface Of Three Thousand & Amp; Nine Hundred Twenty Square Meters (3,920.00 M²).