(1)Supply, Installation, Testing And Commissioning Of Onboard Kavach Loco Equipment As Per Rdso Spec No. Rdso/Spn/196/2020, Ver 4.0 Or Latest. The Scope Of Supply Will Also Include: (A) Supply And Installation Of Lte Router As Per Ts No. St-54/2023/Lte Router Ver 3.0P Jul24 Or Latest, (B) Supply And Installation Of Cab Roof Top Antenna As Per Ts No. St-54/2023/Cra Ver 2.0P Jul 2024 Or Latest, (C) Complete Wiring, Harnessing, Cabling And Connection With Loco Kavach System And Lte Router With Cab Roof Top Antennas. Warranty Period 04 (Four) Years From The Date Of Issue Of Completion Certificate (As Stipulated In Annexure-I, Para- 5 & 6). Annual Maintenance For 11 (Eleven) Years Will Be As Per Annexure-I. Zonal Railway Shall Provide Sim As Per Requirement. [ Warranty Period: 60 Months After The Date Of Delivery ] . (2) Supply, Installation, Testing And Commissioning Of Onboard Kavach Loco Equipment As Per Rdso Spec No. Rdso/Spn/196/2020, Ver 4.0 Or Latest For Wag-12 Or Ef12K Locomotives As Per The Scheme Approved By Coe/Iriset & Rdso. The Scope Of Supply Will Also Include: (A) Supply And Installation Of Lte Router As Per Ts No. St-54/2023/Lte Router Ver 3.0P Jul24 Or Latest, (B) Supply And Installation Of Cab Roof Top Antenna As Per Ts No. St-54/2023/Cra Ver 2.0P Jul 2024 Or Latest, (C) Complete Wiring, Harnessing, Cabling And Connection With Loco Kavach System And Lte Router With Cab Roof Top Antennas. Warranty Period 04 (Four) Years From The Date Of Issue Of Completion Certificate (As Stipulated In Annexure-I, Para- 5 & 6). Annual Maintenance For 11 (Eleven) Years Will Be As Per Annexure-I. Zonal Railway Shall Provide Sim As Per Requirement. [ Warranty Period: 60 Months After The Date Of Delivery ].